Proplanner Lean BIM
- 07/02/2020
- Posted by: PQI Consultant
- Categories:
ProPlanner®
The Best web and mobile platform for managing engineering and construction projects management based on Lean Construction.
Delays and Overspendings
98% of these projects had cost overruns of more than 30% and 77% were at least 40% late (McKinsey, 2015). Large projects take at least 20% longer to finish and are up to 80% over the budget (McKinsey, 2016).
Weak Performance Management
Midstream changes, inadequate communication and lack of accountability lead to unresolved issues Problems piling up. (such as : Site Handover, Drawing Changes, etc).
Connection Gaps
Planning spans alot of aspects; it includes high-end preparation and daily tasks. If daily work does not align with the day’s goal between Owner, Consultant, and Maincont schedulers should be notified but often are not. The system ends in delays due to the absence of real-time updating of task priorities.
Poor Short-Term Calculations
Another construction issue is that companies are good at planning and forecasting outcomes in the next week or two. This often results in delays that may be caused by unavailability of an equipment or materials.
Project Planning
Our platform allows you to import your gant-chart from an MS Project and/or Primavera P6 file and start working on your Master Plan, Look-ahead and weekly plan with amazing detail from our Gantt module.
Reliable Planning
With our Kanban you can create your weekly plan from your previously analysed tasks in the Look-ahead process.
Tasks and Constraints Management
You’ll be able to create and modify tasks and constraints in detail and assign them to different stakeholders in a construction project and everyone will receive an instant notification when that happens.
Fast and Easy-to-Use
ProPlanner® was designed for anyone and everyone in a construction project, built to work fast and intuitively. There are types of users for everyone in the project.
BENEFITS YOU GETS?
- Integration with standard tools such as Microsoft Project and Primavera P6 Oracle
- Collaborative planning between professionals and construction workers
- Optimal space for creation and releasing tasks, constraints, comments and more.
- Immediate access to management information a button away.
- Early-alarms mail system.
- System notifications and alerts reminding smartphone professionals
- Accountability of the activities at hand
- Information of projects in real time
- Offline app
- Information protected by world class servers (Google Cloud and Microsoft)
- Reduce unproductive time on site
- Create synergies and improve coordination between professionals
- Reduce meetings time and increase management time at work.
PQI Consultant – Perusahaan anda tidak hanya dibantu oleh para teknisi, tapi juga oleh konsultan berpengalaman yang bisa membuat sistem perusahaan anda effesien dan effektif.